(Solved): x axis has duration and y axis has number of resources. resource limit is 8. dashed line is 8. using ...



x axis has duration and y axis has number of resources. resource limit is 8. dashed line is 8. using resource leveling what is the minimum duration of work packages?
student submitted image, transcription available below
In the draft resource diagram above. Activitios were initially lald out alphabetically for a Work Package. The Project team has done some analysis, and determined that. there are only 2 predecessor relationships. is dependent on , and is dependent on . They have also updated their estimate of durations. is now days and is days. Note the project manager does not want to split an activity into multiple chunks of time, if they start an activity that is 3 days in duration they want it completed in 3 days atter the start. Using resource leveling with the dashed line representing the maximum resources per day, what is the minimum duration of the Work Package?


We have an Answer from Expert

View Expert Answer

Expert Answer



Based on the given information and the resource leveling constraints, we can determine the minimum d...